We acquire the unique source right of Han feng power plant cenosphere.
Hebei Hanfeng Power Generation Co., LTD was jointly established with 40% of the capital contributed by Hebei Electric Power Company (including North China Electric Power Group Company), 20% by Hebei Construction Investment Company, 24% by German Siemens Company and 16% by German Hamburg Power Company. Be fully responsible for the fund-raising, engineering construction and operation of the power plant project.
The current operating installed capacity of Handan Feng Power Plant is 1,320 MW. The two 660MW imported units of the first phase project were laid the foundation on December 8, 1996. Unit 1 was officially put into commercial operation on March 26, 2001, and Unit 2 was officially put into commercial operation on September 1, 2001. As of December 31, 2010, Handan Peak Power Plant had cumulatively generated 73.15 billion kilowatt-hours of electricity.
Located 3km away from Hanfeng power plant, in total produce 3.5million cubic meter fly ash.
The estimated output period is 10-15years.
Our cenosphere processing plant acquired the sole purchasing right of raw cenosphere and fly ash in 2025.
we can process 300-400tons cenosphere, true denstiy 0.75-0.85g/cc, aluminum content 30% min, light color cenosphere.